Data Center Power and the Questions You Should Ask

Generator_Power_Data_Center

In any mission-critical facility, the electrical system is the most important component in ensuring reliable, uninterrupted operations. Data Specialties provides power systems of all types from basic to complex. Data Specialties starts by determining the available power capacity and compare that to our client’s current and projected needs.

Data Specialties continuously study advances in technology and techniques, and are confident in advising our clients about the most reliable and cost- effective system configurations.

Here are 3 questions our clients have about electrical systems:

1. What options do I have for bringing alternate voltages to the rack?
2. Is it worth running my UPS in eco mode?
3. What is the most cost-effective way to feed dual power supplies?

Services:
o Busway
o Energy storage systems
o EPO systems
o General lighting systems
o Generators
o Grounding systems
o Power distribution systems
o Power cabling
o Uninterruptible Power Supply (UPS) systems

Data Specialties Inc. has been awarded a third project with CTDI (Communications Test and Design) out of West Chester, PA.

FOR IMMEDIATE RELEASE:

Data Specialties Inc. has been awarded a third project with CTDI (Communications Test and Design) out of West Chester, PA.

Davenport, FL – October 16, 2013 – Data Specialties Inc. has been awarded a third project with CTDI (Communications Test and Design) out of West Chester, PA. The latest award is for a complete design/build project including general, construction, electrical and low voltage cabling, within 120,000 sq. ft. warehouse in Davenport, Florida. CTDI has several mission critical facilities that support cable TV, set top box repair and shipping, which includes numerous contracts with cable TV companies supporting local and nationwide markets. All of the CTDI facilities include the design and build of testing areas, production lines, warehouse lighting, UPS systems, backup generators, new utility service, new power distribution and transformers, new mechanical systems throughout, IT and Headend support.

DSI has most recently completed a 135,000 sq. ft. facility in Fontana, CA. and previously a 250,000 sq. ft. build out in Tolleson, AZ. All of these projects have been fast track with design complete in 2-4 weeks, ready for permitting. The fast track construction is completed within 7-10 weeks, once DSI has the approval to start work from the local permitting agency. DSI has also participated in construction management with CTDI projects located in Charlotte, North Carolina, Nashville, Tennessee  and Columbus, Ohio.

Chris Bibeau (DSI’s Regional Director) states:  “DSI and CTDI have developed an extraordinary partnership over the last few years as we continue to meet our clients pressing demands. DSI has not missed or jeopardized a deadline or commitment to our clients for these very complex projects. The teamwork from both DSI and CTDI is what makes our relationship so successful.”

DSI is a nationwide data center and mission critical design build general and electrical contractor licensed in most States with 5 offices throughout the nation. For further information on our services, please visit www.WeBuildDataCenters.com or contact toll free at 800-454-5164.

###