Data Specialties Inc. was selected from stiff competition to complete the second major project for a California-based insurance company. The Scope of this project was to design/build and construct a new 2 floor building to house UPS and critical switchgear; the project encompassed the following:

  • CONSTRUCT A NEW 2 STORY UPS BUILDING AND SECOND FLOOR ADDITION
  • SITE CONSTRUCTION WORK REQUIRED TO PROVIDE ELECTRICAL FROM THE MAIN ELECTRICAL SERVICE/GENERATOR TO THE NEW UPS STRUCTURE.
  • INSTALL NEW ELECTRICAL DISTRIBUTION EQUIPMENT
  • 750 KVA, UPS, BATTERY AND MAINTENANCE BYPASS SWITCH
  • RPP AND POWER CABLES
  • NEW 10 TON HVAC SYSTEM FOR UPS ROOM (SINGLE UNIT)
  • TRANSFER (1) PDU AND (4) CRAC UNITS TO “B” SOURCE OF POWER
  • EMERGENCY POWER OFF MODIFICATIONS
  • FIRE AND LIFE SAFETY SYSTEM FOR NEW UPS STRUCTURE AND SECOND FLOOR ADDITION
  • COMMISSIONING, TRAINING, LOAD SHED TESTING, ETC.